SHIFT HANDOVER · MINING & QUARRY

Crew change in 2 minutes, not 45.

Mining runs 12-hour shifts on remote sites. At crew change, the outgoing foreman transfers knowledge in five minutes or not at all. The incoming foreman reconstructs for 45 minutes before any decision is made. Opsima captures shift state from radio and WhatsApp and delivers the brief before the incoming shift boards. Personalized software to run your mine.

Runs on SAP PM, Maximo, Modular MiningRadio + WhatsApp + Teams captureLive in weeks, not quartersPay only after go-live

THE CREW-CHANGE GAP

We lose the first 45 minutes of every shift to equipment verification. In remote ops, that's two production cycles gone.

How the night actually went

06:00 Incoming foreman boards the site bus. Outgoing foreman gave a 5-minute verbal debrief at the gate.
06:15 Foreman arrives at pit. Dispatch board shows 14 haul trucks active. Three of them are not.
06:20 HT-07 has been on the ramp since 03:00. No work order in SAP. Fitter waiting on parts.
06:30 Dispatch allocates two loads to HT-07. Operator radios that it has not moved in three hours.
06:40 DR-03 came back online at 04:55. Nobody told the blast scheduler. Blast plan still shows the drill as unavailable.
06:55 Foreman has the full picture. Forty-five minutes after crew change, two production cycles already lost.

What slips when the radio knows and SAP doesn't.

The off-system gap

Night-shift repairs, drill status changes, and deferred items never reach SAP and the fleet system before crew change. The incoming foreman inherits a stale picture and rebuilds it from radio calls, not from data.

45 minutes of reconstruction before a single production decision

Dispatch runs blind

Your fleet system still shows the broken haul truck as active because the status was never updated after the night breakdown. Dispatch allocates loads to it. The correction comes from the operator, not from the system.

Two production cycles lost before the pit picture is accurate

PM drifts into corrective

When the CMMS has no record of a deferred service from last shift, the PM schedule treats the machine as on track. Deferred work accumulates across crew changes and surfaces as the next unplanned breakdown during a peak production window.

Deferred maintenance compounds invisibly across 12-hour shifts

From radio call to live in your system, without a 14-month IT project.

1
Listen

Connect to the channels your crew already uses.

We integrate with the systems your mine already runs. CMMS (SAP PM, Maximo, MainPac, Pronto), your fleet or dispatch system (Modular Mining DISPATCH, Wenco, Hexagon), WhatsApp, Teams, and your radio transcript source. Nothing for operators, fitters, or foremen to install. Nothing in the crew-change routine changes.

CMMS work-order and status read/write (SAP PM, Maximo, MainPac, Pronto)
Fleet system status update (Modular Mining DISPATCH, Wenco, Hexagon)
WhatsApp Business, Teams, Slack, SMS ingest
Radio transcription API
Phase output
LISTEN · DELIVERABLE
CMMS work-order and status read/write (SAP PM, Maximo, MainPac, Pronto)
LISTEN · ARTIFACT
Fleet system status update (Modular Mining DISPATCH, Wenco, Hexagon)
2
Spec

A working session with the people who run the pit.

Your shift foreman, maintenance planner, and IT walk us through one real crew change. We capture what the incoming foreman needs to know: haul truck and drill states, in-progress repairs, parts on order, deferred maintenance, and the SAP and fleet-system fields that need to reflect reality before the bus arrives. The workflow is sketched in their words, then turned into a structured spec and a mockup you can read before any code is written.

Structured working session, no IT ticket required
Spec + mockup written from your operation's own language
Handover data model, escalation rules, and SAP + fleet-system field map captured
Phase output
SPEC · DELIVERABLE
Structured working session, no IT ticket required
SPEC · ARTIFACT
Spec + mockup written from your operation's own language
3
Build

Real code, in staging, on your data.

The crew-change workflow is built end to end in a staging environment connected to your real systems. Ingest, classification, SAP write, fleet system status update, and crew-change brief generation. Your IT reads the codebase, the integrations, and the risk report before anything touches production. No black box.

Real code, any language, no complexity ceiling
Staging connected to your real SAP and fleet system
Codebase, risk report, and rollback handed to IT to review
Phase output
BUILD · DELIVERABLE
Real code, any language, no complexity ceiling
BUILD · ARTIFACT
Staging connected to your real SAP and fleet system
4
Go-live

IT deploys. We run it with you on real shifts.

IT promotes the workflow to production. We run it with you on real shifts until it produces what we agreed on: captures the crew-change state, updates SAP and the fleet system, and delivers the brief before the incoming foreman boards the bus. You pay only after it goes live and the crew-change brief on real shifts matches the spec.

One-click production deploy, one-click rollback
Run-with-you period on real shifts
Payment after the workflow produces the agreed outcome
Phase output
GO-LIVE · DELIVERABLE
One-click production deploy, one-click rollback
GO-LIVE · ARTIFACT
Run-with-you period on real shifts

Crew change, on your existing fleet system and CMMS.

Without Opsima
  • Outgoing foreman verbal debrief is 5 minutes at the gate, incomplete by design
  • Fleet system shows active trucks that have been on the ramp for hours
  • SAP has no work orders for active overnight repairs, parts on order invisible
  • Incoming foreman spends 45 minutes reconstructing actual fleet state
  • Dispatch allocates loads to broken trucks, corrections by radio call
  • Deferred maintenance not in SAP, PM schedules run on stale data
With Opsima
  • Structured crew-change brief delivered before incoming foreman boards the site bus
  • Active breakdowns, deferred items, and parts-on-order captured from radio and WhatsApp
  • SAP updated with correct timestamps and work-order status before crew change
  • Fleet system status reflects actual availability before dispatch re-runs
  • Incoming foreman starts with full pit picture, zero reconstruction required
  • Deferred maintenance tracked in SAP with reason and deferral timestamp
2 min
Full crew-change brief delivered
0
Unverified truck counts at shift start
100%
Night-shift exceptions captured

Numbers we have actually measured.

Field-observed
45 min
Lost per shift to equipment verification at crew change, before deployment
Field-observed across mining and quarry operations
Industry-typical
~60%
Share of operational reality that never reaches the fleet system or CMMS after a shift
Off-system pain wedge, observed across mining and quarry operations
Taavura
Daily
Granularity of shift-start delay tracking after deployment, versus monthly before
Taavura Earth Moving · field deployment
Taavura
Real time
Fleet availability visibility previously unknown per machine, now known continuously
Taavura Earth Moving · field deployment

Before, and after.

It was very difficult to get the real operational picture. It used to feel like the weather. Some months better, some months worse. Before, I felt it. Now, I know.

H
Hagai Shenar
Deputy CEO, Taavura Earth Moving

Since launching, I no longer tell the site manager, last week you were missing 30 hours of output. I tell him: yesterday you were missing half an hour of output.

H
Hagai Shenar
Deputy CEO, Taavura Earth Moving

No one needs to feed the system. It feeds itself.

H
Hagai Shenar
Deputy CEO, Taavura Earth Moving
Working session

Your operation.
Your real data.
Software built for it.

Tell us one process you have given up on fixing. We build it on your actual systems and run it with you. You pay only after it goes live.

On your existing stack
Live in weeks, not quarters
Pay only after go-live
Built and run for you